Our Work

City of Mesa South CAP WTP

MESA, ARIZONA

To fully experience this website you need to have Adobe Flash Player installed. Click here to begin your free download.

PROJECT DETAILS

Eight mg reservoir and booster pump station. Improvements include the installation of several 24" to 42" diameter waterlines, construction of 8 million gallon cast-in-place reinforced concrete potable water storage reservoir (59,535-sf) and a booster pump station (18,256-sf) with facilities to deliver water to the city of Mesa's Desert Wells and Desert Sage pressure zones.

For more information on this project, please contact:

Jim Curcio
Preconstruction Director, Southwest Division
480/449-4700

  • Water/Wastewater


(R)