Deer Valley Water Treatment Plant

PHOENIX, ARIZONA

To fully experience this website you need to have Adobe Flash Player installed. Click here to begin your free download.

PROJECT DETAILS

100 mgd water treatment facility. Packages one and two included the construction of one wash water equalization basin, chlorine dioxide system building, sodium chloride facility, ferrous chloride facility, and earthwork in the east plant area, as well as construction of presedimentation basins and sand ballasted froculation structures. Package three included construction of gas filters, ferrus chloride building and process chemical modifications.