Furnished and installed cast-in-place concrete ringwalls for six tanks.
Ameren Bagnell Dam Stabilization
Toyota MOST
McCarthy developed an integrated construction solution aligned with Ameren’s expectations and requirements for the dam project.
View Ameren Bagnell Dam Stabilization
McCarthy was selected to be the construction manager and general contractor on a portion of this project that included construction of 13 tanks.
View LBC ME Global
Construction of eight - 139' diameter, shallow ringwall foundations for above-ground storage tanks.
View Magellan Phase II Tank Ringwalls
This new Ship Dock facility and two barge docks support the expansion of terminal operations and storage capacity.
View LBC Ship Dock 4