The Children's Hospital Outpatient Center will be home to an amazing array of services including 21 pediatric specialties.
View Children's Hospital at Erlanger Outpatient Center
McCarthy’s self-perform work included all site work, 1:1 battered pile, sheet piling, waler system installation, driving of monopile, fender installation and utilities work.
View Sunoco Barge Docks A&D
Furnished and installed cast-in-place concrete ringwalls for six tanks.
View Magellan E. Houston Tank Ringwalls
Construction of 40 acres of a concrete bulk terminal for container storage at the Bayport Terminal for the Port of Houston.
View POH Bayport Container Yard 7
McCarthy developed an integrated construction solution aligned with Ameren’s expectations and requirements for the dam project.
View Ameren Bagnell Dam Stabilization
Constructed for the City of St. Louis, this seven-story, 299,340-square-foot Justice Center was built to house 732 inmates.
View St. Louis City Justice Center
Life Sciences research facility with labs, offices, greenhouses, meeting space and other features.
View Donald Danforth
The project was completed on a tight schedule, on a small site without disruption of an active refinery, despite record wet weather.
View ConocoPhillips Wastewater Treatment Plant
A 256,700-square-foot, six-level, 750-car, fully sprinkled, shear wall parking structure with a helipad on its roof.
View Henry Mayo Newhall Parking
Completed in August 2018, the seven-floor, 320,000-square-foot Knight Center Research Building will serve as a home for up to 650 researchers and staff whose focus is on cancer research and early detection.
View OHSU Knight Cancer Research Building
Modernization portion of the project includes repurposing and modernization of the H and J wings.
View Bella Vista High School Science Classroom
A 3,800-square-foot, design-build renovation of the existing bar at Thunder Valley Casino.
View Thunder Valley Falls Bar Renovation