Completion of the center is slated for summer 2020.
View Collin College Technical Campus
McCarthy and its trade partners conducted multiple pre-testing scenarios to ensure all testing would be accepted.
View CHRISTUS Spohn Health System
This 150,000-square-foot, 14-story, Class A office tower located in Uptown Dallas includes office space, parking garage and 8,500 square feet of ground-floor retail and restaurant space.
View 1920 McKinney
McCarthy was selected by Houston METRO to construct this 2,400-linear-foot grade separation over the HBT/UPRR railroad tracks.
View Houston METRO Harrisburg Overpass
McCarthy self-performed concrete paving, placement and finishing, bridge erection, site preparation and subgrade, sheet pile, excavation and embankment.
View Texas A&M Wellborn Road Underpass
McCarthy was selected by Sunoco Logistics Partners, LP to construct two new barge dock slips to support expanded terminal operations and storage capacity.
View Sunoco Barge Docks A&D
McCarthy was selected by Texas Department of Transportation to demolish and replace two existing bridge protection dolphins for the Rainbow Bridge.
View State Highway 73 Rainbow Bridge
McCarthy completed this widening and complete reconstruction of a three-mile stretch of IH-635 and the intersection at Town East Blvd for TxDOT.
View IH-635 at Town East Blvd
The forensic lab features leading-edge forensic science and laboratory design and houses approximately 120 employees.
View Institute for Forensic Science
The terminal redevelopment plan will expand the five-level garage to include more than 3,920 new parking spaces.
View DFW Airport Terminal E
McCarthy performed widening and complete reconstruction of a three-mile stretch of IH-410 and the intersection at San Pedro Avenue for TxDOT.
View Bexar County IH-410 & San Pedro
The 203,000-square-foot, four-story Children’s Health Specialty Center 2 is an innovative building featuring a variety of interdisciplinary services.
View Children's Health Specialty Center 2