McCarthy committed to a 24/7 schedule in order to ensure successful delivery in a scenario where extra time was not an option.
View Delta Air Lines Enabling Project
The project was completed safely in multiple phases over 38 months.
View LAX Tom Bradley International Terminal
Nearly the length of three football fields, the canopies create a dramatic entrance to the Domestic Terminal from both the ground and sky.
View Hartsfield-Jackson Atlanta International Airport
The project included demolition of the existing CUP as well as construction of a new steel-framed replacement CUP with a 20,000-ton cooling capacity.
View LAX Central Utility Plant
A new cargo facility uses the latest technology to maximize performance of the building.
View SFO West Field Cargo Facility
225,000-square-foot new East Terminal, including ticketing area, passenger concourse and baggage claim area.
View Lambert Airport East Terminal
New 282,000-square-foot, three-level Terminal C building plus a basement to the existing 448,000 square feet in Terminals A and B.
View John Wayne Airport Terminal C
The project adds 0.6 miles of guideway and a single station serving both Terminals 2 and 3 with a pedestrian bridge.
View Sky Harbor Airport — Sky Train
Terminal D Elevated Roadway and Skylink Automated People Mover
View DFW International Airport