This is McCarthy’s first design-build project with the University of Arizona.
View South Stadium Parking Structure
As a result of the design-build team’s unified effort, the parking facility was delivered $500,000 under budget while adhering to its 13-month schedule.
View Marin General Hospital Parking Structure
A 256,700-square-foot, six-level, 750-car, fully sprinkled, shear wall parking structure with a helipad on its roof.
View Henry Mayo Newhall Parking
The garage adjoins the new Police Department building built by McCarthy and provides access to Sallyport for prisoner transfer to jail.
View Westminster PD Parking Structure
This 1,100-card design-build parking structure for the Casino del Sol Resort includes a three-level, 350,000-square-foot cast-in-place garage for hotel and casino guests.
View Casino Del Sol Parking Structure
The team aligned best practices for staging materials and decreased pour cycles, shaving time off the project’s schedule without overtime or additional labor.
View CRMC Parking Structure
Six level, 1,635-car parking structure to accommodate additional parking needs for the University. The cast-in-place structure totals 546,646 square feet.
View ASU Packard Drive Parking Structure
Six-story, 279,000-square-foot tower delivers 178 additional private patient beds and two new parking garages.
View Banner Estrella Medical Center
McCarthy utilized their own forming system to ensure optimum control over the project's cost and quality.
View McCarran International Airport Terminal 3 Parking Structure
The terminal redevelopment plan will expand the five-level garage to include more than 3,920 new parking spaces.
View DFW Airport Terminal E
A 222,000-square foot, 613-car underground parking garage.
View AT&T Performing Arts Parking
The building houses faculty members, researchers and graduate students.
View Rensselaer Polytechnic Institute