A 256,700-square-foot, six-level, 750-car, fully sprinkled, shear wall parking structure with a helipad on its roof.
View Henry Mayo Newhall Parking
The garage adjoins the new Police Department building built by McCarthy and provides access to Sallyport for prisoner transfer to jail.
View Westminster PD Parking Structure
The California State University, Los Angeles Student Housing East project consists of a new, 380,000-gross-square-foot, 7-story student housing facility.
View CSU Los Angeles Student Housing East
The Orange County Water District Ground Water Replenishment System treats up to 100-million gallons of wastewater per day.
View OCWD — Ground Water Replenishment System
The project included demolition of the existing CUP as well as construction of a new steel-framed replacement CUP with a 20,000-ton cooling capacity.
View LAX Central Utility Plant
The facility produces locally controlled, recycled water instead of importing water from the northern part of the state.
View Oxnard Water Treatment Facility
A five-level, 88,132-square-foot multi-purpose, proscenium-style theater hall with 1,050 seats, rehearsal space, associated performer and support space.
View Chapman University Musco Center for the Arts
The new, 50,000-square-foot County of Riverside, Department of Public Social Services provides necessary Self-Sufficiency services to the surrounding region.
View County of Riverside, DPSS
A 5-level, 513,692-square-foot parking structure built to hold 1,535 cars.
View Hyundai Parking Structure
New 282,000-square-foot, three-level Terminal C building plus a basement to the existing 448,000 square feet in Terminals A and B.
View John Wayne Airport Terminal C
McCarthy constructed this 214,983-square-foot, four-level, post-tensioned cast-in-place concrete design-build parking structure for 682 cars.
View Soka University Parking Structure
New, 50,000-square-foot Performance Arts Center and 48,974-square-foot Academic Building.
View Soka Performing Arts Center