Completed in August 2018, the seven-floor, 320,000-square-foot Knight Center Research Building will serve as a home for up to 650 researchers and staff whose focus is on cancer research and early detection.
View OHSU Knight Cancer Research Building
Modernization portion of the project includes repurposing and modernization of the H and J wings.
View Bella Vista High School Science Classroom
A 3,800-square-foot, design-build renovation of the existing bar at Thunder Valley Casino.
View Thunder Valley Falls Bar Renovation
A new full-service Judicial Council of California San Andreas Courthouse consisting of four multi-use courtrooms.
View San Andreas Courthouse
The Betty Irene Moore School of Nursing is a new design-build, 70,000-square-foot education building at the University of California-Davis.
View UC Davis — Betty Irene Moore Hall
The team aligned best practices for staging materials and decreased pour cycles, shaving time off the project’s schedule without overtime or additional labor.
View CRMC Parking Structure
The 101,900-square-foot facility provides advanced educational and research capabilities.
View UC Merced Science & Engineering Building 2
Three buildings, totaling 128,000 square feet, were constructed to support the growing fleet of buses and service vehicles.
View San Joaquin RTD
New 45,464-square-foot school consisting of an administration building, science and lab, classroom and two general classroom buildings.
View School of Engineering & Sciences
A 417,000-square-foot, design-build, 7-level, 1,200-space parking structure.
View UC Davis Health System Parking Structure III
266,000-square-foot, 185-bed replacement hospital for the consolidation of two existing campuses.
View Dignity Health Mercy Medical Center
New 45,808-square-foot 500-student high school.
View George Washington Carver School of Arts